Estimated Loss
$8.8B
Ground-up structural loss (Mode 1)
$190.1B total RCV in bbox
Color Mode
Zone Legend
Z1Core (interior)
Z2Transition (0–150m)
Z3Ember cast (downwind)
Z4Fringe (500m–1.5km)
Zone Summary
| Zone | Structs | Est. Loss |
|---|---|---|
| Z1 | 18,702 | $6,847M |
| Z2 | 5,349 | $702M |
| Z3 | 125 | $6M |
| Z4 | 30,678 | $413M |
Layers
Perimeter: NIFC GeoMAC (final, 100,874 ac)
Structures: Hummingbird SI (CA)
Zones: geometric distance from perimeter
DR: pre-calibration fixed values